{"id":524,"date":"2019-09-02T04:44:32","date_gmt":"2019-09-02T04:44:32","guid":{"rendered":"https:\/\/aaadownunder.com.au\/?p=524"},"modified":"2019-09-02T04:44:32","modified_gmt":"2019-09-02T04:44:32","slug":"wallsend-ambulance-station-stage-2","status":"publish","type":"post","link":"https:\/\/aaadownunder.com.au\/index.php\/2019\/09\/02\/wallsend-ambulance-station-stage-2\/","title":{"rendered":"Wallsend Ambulance Station Stage 2"},"content":{"rendered":"\n<p>This is Wallsend Ambulnce Station.<\/p>\n\n\n\n<p>Alot of big screw piling jobs will be in stages. this job at Wallsend recently was in 2 stages a few months apart. Due to some piles being in the way for other trades if they were done at the first visit.<\/p>\n\n\n\n<p>First Stage was the Retaining walls and detention tanks and second stage was for all of the remaining and  internal piles.<\/p>\n\n\n\n<ul class=\"wp-block-gallery columns-3 is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\"><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"480\" height=\"640\" src=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/waallsend-4.jpg\" alt=\"\" data-id=\"525\" data-link=\"https:\/\/aaadownunder.com.au\/?attachment_id=525#main\" class=\"wp-image-525\" srcset=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/waallsend-4.jpg 480w, https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/waallsend-4-225x300.jpg 225w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"480\" height=\"640\" src=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-1.jpg\" alt=\"\" data-id=\"526\" data-link=\"https:\/\/aaadownunder.com.au\/?attachment_id=526#main\" class=\"wp-image-526\" srcset=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-1.jpg 480w, https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-1-225x300.jpg 225w\" sizes=\"auto, (max-width: 480px) 100vw, 480px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-2.jpg\" alt=\"\" data-id=\"527\" data-link=\"https:\/\/aaadownunder.com.au\/?attachment_id=527#main\" class=\"wp-image-527\" srcset=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-2.jpg 640w, https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-2-300x225.jpg 300w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-3.jpg\" alt=\"\" data-id=\"528\" data-link=\"https:\/\/aaadownunder.com.au\/?attachment_id=528#main\" class=\"wp-image-528\" srcset=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-3.jpg 640w, https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-3-300x225.jpg 300w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/figure><\/li><li class=\"blocks-gallery-item\"><figure><img loading=\"lazy\" decoding=\"async\" width=\"640\" height=\"480\" src=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-5.jpg\" alt=\"\" data-id=\"529\" data-link=\"https:\/\/aaadownunder.com.au\/?attachment_id=529#main\" class=\"wp-image-529\" srcset=\"https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-5.jpg 640w, https:\/\/aaadownunder.com.au\/wp-content\/uploads\/2019\/09\/wallsend-5-300x225.jpg 300w\" sizes=\"auto, (max-width: 640px) 100vw, 640px\" \/><\/figure><\/li><\/ul>\n","protected":false},"excerpt":{"rendered":"<p>This is Wallsend Ambulnce Station. Alot of big screw piling jobs will be in stages. this job at Wallsend recently was in 2 stages a few months apart. Due to some piles being in the way for other trades if they were done at the first visit. First Stage was the Retaining walls and detention tanks and second stage was for all of the remaining and internal piles.<\/p>\n","protected":false},"author":2,"featured_media":528,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-524","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/posts\/524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/comments?post=524"}],"version-history":[{"count":2,"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/posts\/524\/revisions"}],"predecessor-version":[{"id":531,"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/posts\/524\/revisions\/531"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/media\/528"}],"wp:attachment":[{"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/media?parent=524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/categories?post=524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aaadownunder.com.au\/index.php\/wp-json\/wp\/v2\/tags?post=524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}